2006 Price list

Effective April 1, 2006

PRE PAID RATES UNDER CONTRACT

 

 

LIFT LAUNCH AND HAUL-OUT FEES minimum, travel lift or rail ways. . . . . . . . . . . . . . . . . . . . . . . $12.50/ft

               Additional fees may apply for special conditions or for vessels over 40 ft long or 10 ft wide or for

               additional slings, additional labor, etc.

FILTER CLOTH, each change (required when dirty or saturated) . . . . . . . . . . . . $3.00/ft plus labor time and lift

 

SERVICES

Repaint bottom, includes up to one hour pressure washing and prep. . . . . . . . . . . . . . . . . . .$ 15.00/ft plus material

       (up to 8ft wide, then add 1$ per lin. Ft, for each 1 foot of beam, includes 2 coats)

Epoxy Barrier coat, includes one hour prep and no fairing or filling. . . . . . . . . . . . . . . . . $50.00/ ft plus material

      Any additional cleaning, sandblasting, fairing, filling, etc. . . . . . . . . . . . . . . . . . $75.00/hour plus material

Labor rate (minimum 1 hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00/hour

 

 

Rates in this publication are estimates actual charges may vary from vessel to vessel and rates are subject to change without notice

 

Unless otherwise noted, ALL PER FOOT CHARGES ARE CALCULATED BASED ON THE ABSOLOUTE LENTH OVERALL (LOA), inclusive of bow sprints, dive platforms, engine gears, and the like, or the length of any wet slip being used, which ever is greater.