JEAN STREET SHIPYARD

2006 Price list

Effective April 1, 2006

PRE PAID RATES UNDER CONTRACT

Vessels not pre-paid, add $15.00 per day, vessels not under contract, add $75.00 per day

 

DRY STORAGE ON WAYS in work yard, pre-paid with 5 day minimum . . . . . . . . . . . . . . . . . . . . $40.00/day

                Plus hook-up fees, metered charges for utilities, and other services as they apply.

                Monthly discounts may be applied when pre-paid pay for first 20 days of a full calendar month only

(other conditions may apply)

Parking for boat trailer or small boat on trailer (up to 19 ft, 3 month minimum pre-paid) . . . . . . $80.00/month

Parking for boat trailer or small boat on trailer (20 to 29 ft, 3 month minimum pre-paid) . . . . . . $200.00/month

 

Re-launch for vessels on ways must be scheduled in writing at least 14 days prior, full daily charges apply until launch, even if launch is delayed by yard schedule or equipment failure. PAYMENT FOR LAUNCH AND ALL OUTSTANDING CHARGES MUST BE PAID IN CASH OR CERTIFIED FUNDS, AND MUST BE PAID WHEN LAUNCH IS SCHEDULED  Fee for missed launch is $100.00, All lift charges, including missed launch, Saturday, Sunday or Holiday are double.

 

 

LIFT LAUNCH AND HAUL-OUT FEES minimum, travel lift or rail ways. . . . . . . . . . . . . . . . . . . . . . . $12.50/ft

               Additional fees may apply for special conditions or for vessels over 40 ft long or 10 ft wide or for

additional slings, additional labor, etc.

Layover on rail ways, pre-paid, first 3 days . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 45.00

Layover on rail ways, pre-paid, day 4 through day 30 . . . . . . . . . . . . . . . . . . . . . . . . $ 65.00/day

Layover on rail ways, pre-paid, day 31 to 90 . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00/day

Layover on ways, (railway or travel lift), pre-paid, day 91 to 180 . . . . . . . . . . . . . . . . . $225.00/day

Reposition to work yard or to lift, each move, $75.00/HR. . . . . . . . . . . . . . . . . . . . . . . $100.00 minimum

FILTER CLOTH, each change (required when dirty or saturated) . . . . . . . . . . . . $3.00/ft plus labor time and lift

 

SERVICES

Repaint bottom, includes up to one hour pressure washing and prep. . . . . . . . . . . . . . . . . . .$ 15.00/ft plus material

       (up to 8ft wide, then add 1$ per lin. Ft, for each 1 foot of beam, includes 2 coats)

Epoxy Barrier coat, includes one hour prep and no fairing or filling. . . . . . . . . . . . . . . . . $50.00/ ft plus material

      Any additional cleaning, sandblasting, fairing, filling, etc. . . . . . . . . . . . . . . . . . $75.00/hour plus material

Labor rate (minimum 1 hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00/hour

Outside labor surcharge* (approved contractors) . . . . . . . . . . . . . . . . . . per job fee, plus $ 45.00/person/day

Tractor, travel lift, or boom truck, in yard (one hour minimum) . . . . . . . . . . . . . . . . . . . $ 75.00 per hour

Hydraulic Trailer in yard, $100.00 hook-up fee, in yard, (includes first one-half hour) . . . . . . . $100.00/hr

 

OUTSIDE SERVICES

Outside contractors providing services for your vessel while in our workyard will be charged a surcharge based on a percentage of the job, and/or a minimum rate of $ 40.00 per person per day.

 

RIGGING EQUIPMENT in yard

day 1 to day 30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .no charge

day 31 to day 365, and each 365 days (or part thereof) after:

Blocking  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2.00 each

Jack Stands  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 35.00 each

                Sail Boat Stands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 75.00 each

OTHER EQUIPMENT

pressure washer (2 hr. minimum) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00/hour

Battery charger, 2 amp to 10amp  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10.00 initial fee, plus $3.00 per day

electric pumps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 10.00 initial fee, plus $6.00/day

3 inch mud pump, or centrifugal pump, each (used or not) . . . . . . . . . . . . . . . . . . . . . . .$125.00 initial fee, plus $30.00 /day

 

TRASH REMOVAL

$100.00 minimum fee, plus $10.00 per item or $1.00 per pound which ever is greater, plus $2.00/round trip mile, plus posted labor rate, plus applicable dump fees at cost +30%.

Hazardous or Class III trash subject to a minimum $175.00 documentation fee, plus placard fees and special assessments.  Storage charges will apply. All Hazardous or Class III removed by outside contractors, cost +30%+ $300.00

TRASH REMOVAL pre arranged

small dump trailer, non-hazardous, . . . . . . . . . . . . . . . . . . . . . dump fees plus 15%, plus $75.00 per load

approved petroleum in sealed 5 gallon containers, . . . . . . . . . . . . . . . . . . . $25.00 each plus disposal fee

Batteries, each  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$10 .00

Paint cans, brushes, rollers, dry, each  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$2 .00

Cleaning up after dog or pet $20.00 Cigarette butts $2.00 each, 20.00 minimum each time

 

All clean up and disposal costs for paint chips, paint drips, grinding and sanding dust, and the like will be charged at cost + 25%, plus transportation, + $75.00 per hour for clean up.

 

Work yard Materials not supplied by Jean Street Shipyard, Inc. will be charged an assessment fee when brought into the yard

 

ALL PAYMENT MUST BE IN CASH OR CERTIFIED FUNDS.  NO VESSEL WILL BE LAUNCHED OR RELEASED FROM MARINA UNTIL ALL CHARGES ARE PAID IN FULL.  Our policy is firmly, NO CASH - NO SPLASH

 

Rates in this publication are estimates actual charges may vary from vessel to vessel and rates are subject to change without notice

 

Unless otherwise noted, ALL PER FOOT CHARGES ARE CALCULATED BASED ON THE ABSOLOUTE LENTH OVERALL (LOA), inclusive of bow sprints, dive platforms, engine gears, and the like, or the length of any wet slip being used, which ever is greater.